The window trim has been installed along with the water barrier, siding is next. Inside the rough-in is nearly complete. Insulation should begin in March.

The kitchen sink will have plenty of natural light with these windows.

The kitchen sink will have plenty of natural light with these windows.

The bay will eventually be all trim, making it a focal point on the rear of the house.

The bay will eventually be all trim, making it a focal point on the rear of the house.