The Johnson Partnership The Johnson Partnership The Johnson Partnership The Johnson Partnership The Johnson Partnership The Johnson Partnership
The Johnson Partnership
The Johnson Partnership
The Johnson Partnership
The Johnson Partnership1212 NE 65th St., Seattle, WA 98115  206-523-1618

In the Works…

Posts tagged ·

Remodel

·...

May 25, 2017 12:22 pm

One of our projects is on the market

The remodel we designed ‘Lake Washington Boulevard Second Story’ is currently for sale.  Below is a scan of the flyer where we are mentioned by name (Thank you to the real estate agent and owner.) You can see a before and after photo on our website here.

Lake Washington Second Story remodel we completed in 2010 is on the market.

Lake Washington Second Story remodel we completed in 2010 is on the market.

May 18, 2017 11:50 am

Emerald Park Addition is ready for finishes!

The drywall has been installed. The remodel is ready for finishes: cabinets, trim, floors and paint.

The back deck.

The back deck. The space under the deck will be dry space–screened from view, and used for storage.

The kitchen skylight well and window seat.

The kitchen skylight well. The window seat will also serve as seating for the kitchen table.

The bay window in the master bedroom looks out to the back yard.

The bay window in the master bedroom looks out to the back yard.

February 24, 2017 4:13 pm

Emerald Park Addition is ready for siding

The window trim has been installed along with the water barrier, siding is next. Inside the rough-in is nearly complete. Insulation should begin in March.

The kitchen sink will have plenty of natural light with these windows.

The kitchen sink will have plenty of natural light with these windows.

The bay will eventually be all trim, making it a focal point on the rear of the house.

The bay will eventually be all trim, making it a focal point on the rear of the house.

February 1, 2017 10:50 am

Landscaping has been roughed in at the Burke Remodel

With construction complete the landscaping is next.

The 'always green' astroturf was chosen to be pet and moss resistant. 

The ‘always green’ astroturf was chosen to be pet and moss resistant.

January 27, 2017 4:15 pm

Progress at Emerald Park

Framing and roofing are complete and the windows are due next week. We just completed the electrical walkthrough with the client verifying fixture, outlet and switch locations and functions. A key point in any remodel.

The bay window will be a great place to cozy up with a good book!

The bay window will be a great place to cozy up with a good book!

The kitchen skylight well is framed. the flare will allow the light to spread throughout the kitchen.

The kitchen skylight well is framed. the flare will allow the light to spread throughout the kitchen.

The new bay window and covered section of the deck are now visible.

The new bay window and covered section of the deck are now visible.

The front stoop has been completely replaced.

The front stoop has been completely replaced.

November 2, 2016 10:44 am

ON NEWS STANDS NOW!

Look for Howard Miller’s byline in the Fall/Winter 2016 issue of Fine Homebuilding “Kitchens and Baths, Remodels with Style” (page 38).

One of our projects, featured in Fine Homebuilding Magazine.

One of our projects, featured in Fine Homebuilding Magazine.

October 27, 2016 11:38 am

La Casa del Gato

Just in time for Halloween, a remodel that was completed last month for a family in West Seattle.

The clients wanted a place to sit outside and be connected with the neighborhood so we enlarged their existing front porch.img_4214

The original layout of the main floor of their house was cramped and poorly utilized. We opened the living room to the kitchen, added a fireplace flanked by bookcases and windows, and enlarged the kitchen and replaced the old dining room with a pantry and eating nook.  We also added windows to the west wall of the house to get more afternoon sun.

img_4244img_4237

The old entry door opened into a small foyer that faced a landing for the main stairs so we relocated the front door and reconfigured the main stairs to create a more gracious entry. We even found room for a new coat closet

.img_4235

October 25, 2016 4:41 pm

Just in time for the rains…

The foundations are complete for this addition and the affected portions of the interior have been completely opened up. Next they will be framing — inside and out.

The siding has been removed and the house is ready for the addition to be framed.

The siding has been removed and the house is ready for the addition to be framed.

Temporary lighting is up. this is the location of a bump-out for a window seat and covered deck beyond.

Temporary lighting is up. this is the location of a bump-out for a window seat and covered deck beyond.

The owner is living in the home during the remodel! This is the temporary kitchen.

The owner is living in the home during the remodel! This is the temporary kitchen. (looks like a shop…)

September 27, 2016 10:36 am

A small addition can make a big difference.

This small addition in the green lake neighborhood has just begun and will not be visible from the street. It is not about street appeal. This small addition provides space for a master suite and guest bedroom. But, beyond adding living space, this addition also adds enough optimally oriented roof space for 27 photovoltaic solar panels. They will generate enough power to fully offset the power consumed in the house and charge their electric vehicle. Seattle is going green, one remodel at a time.

The guest bedroom will have its own exterior door for private access.

The guest bedroom will have its own exterior door for private access.

The foundation walls are complete and slab reinforcing placed. nearly ready for the next concrete pour.

The foundation walls are complete and slab reinforcing placed. nearly ready for the next concrete pour.

June 29, 2016 5:03 pm

Just a few last bits to be finished

But the owners are moving in now! Look for this project to show up in our portfolio next spring (after the client is settled and the landscape has been installed).

We retained the existing mantle and installed a new tile surround and hearth and gas insert.

We retained the existing mantle and installed a new tile surround and hearth and gas insert.

There is a generous laundry room right off the mudroom.

There is a generous laundry room right off the mudroom.

The Lower floor bath has a zero threshold shower and the wall tile is flush with the adjacent wall.

The Lower floor bath has a zero threshold shower and the wall tile is flush with the adjacent wall.

The dark body color and white trim really set off the clinker style thin brick veneer on the chimney.

The dark body color and white trim really set off the clinker style thin brick veneer on the chimney.