May 20, 2019 10:32 am

The Cedar Park kitchen remodel is finished!

The client has moved in and is enjoying have the living room at the same floor level as the rest of the main floor and a true open plan lifestyle. Part of the plan moving forward is to add a gas fireplace between the living room and family room, and to expand the deck. Professional photos will follow later in the spring.

The front door is directly opposite the new folding doors and transom windows to the view beyond.

The front door is directly opposite the new folding doors and transom windows to the view beyond.

The owner and contractor shake hands in the entry below the new chandelier.

The owner and contractor shake hands in the entry below the new chandelier.

By opening up the kitchen and switching its location with the dining room, they both have views to the east.

By opening up the kitchen and switching its location with the dining room, both rooms have views to the east.

The kitchen is now open to the living and dining rooms and a large pantry behind the custom buffet cabinet.

The kitchen is now open to the living and dining rooms, and has a large pantry behind the custom buffet cabinet.

February 19, 2019 11:22 am

The Union City Addition is finished!

With so many works-in-progress it’s always a pleasure to announce a completed project! This addition to a split-level home in North Seattle allows the owner to have a bedroom suite on the main floor, a change that will make it easier for them to age at home. For now, the bedroom will function as a study and library until it is needed. The bathroom is fully accessible and includes laundry facilities. We anticipate professional photos this spring.

We salvaged and then incorporated the salvaged brick to tie the addition to the addition.

We salvaged the existing brick and then incorporated it to tie the addition to the existing home.

The vanity under the sink was built to be removed should wheelchair access be required in the future.

The vanity under the sink was built to be removed should wheelchair access be required in the future. The higher portion of the vanity contains a washer and dryer.

The shower is fully accessible and stylish.

The new shower is not only stylish but also fully accessible.

December 27, 2018 9:22 am

Cedar Park Remodel: Ready for Cabinets & Finishes

Today we’re checking in on the Cedar Park remodel, a project that is proceeding nicely and will be wrapping up soon. We’re entering the finishing phase with painting, which will be followed by installation of cabinets and lighting.

The tall accordion doors open off the living room to a large deck and a stunning view of Lake Washington.

The tall accordion doors open off the living room to a large deck and a stunning view of Lake Washington.

With the intervening wall removed the living room is now completely open to the dining and family room.

With the intervening wall removed, the living room is now completely open to the dining and family room.

The kitchen will occupy this corner with an island and a full walk in pantry.

The kitchen will occupy this corner, with an island and a full walk-in pantry.

November 12, 2018 9:29 am

Madison Heights Bungalow Addition & Remodel Nears Completion

Completion is in sight for this addition and remodel on the eastern side of Capitol Hill. The owners will be moving boxes and furniture in anticipation of being granted occupancy in the next couple weeks. All the heavy floor protection shown in the pictures below has since been removed. This will likely be the last installment of progress photos until the clients are fully moved in and the house is furnished and occupied.

The sunroom always seems to have great light; and once the yard gets established it will have a lovely garden right outside the window.

The sunroom always has great light. Once the yard is established there will be a lovely garden right outside the window.

The bathroom wainscot has been installed and the curb-less shower will have its glass door soon.

The bathroom wainscot has been installed, and a glass door will soon be added to the curbless shower.

The back porch and stair are an extension of the line of the sunroom cantilever.

The back porch and stair are an extension of the line of the sunroom cantilever.

The original single brackets at the front door have been doubled to add emphasis to the entry.

The original single brackets at the front door have been doubled to add emphasis to the entry.

October 26, 2018 2:33 pm

The Cedar Park Remodel is Progressing

Today we’re checking in on the Cedar Park project, a remodel that includes creating an open-plan great room on the main floor and taking advantage of the Lake Washington view. With the framing completed, the final form of the space is finally starting to be visible. Installation of the plumbing, electrical, and heating systems is wrapping up, with insulation and wall board coming in the near future.

The transom windows above the folding doors add substantial natural light to the living room.

The transom windows above the folding doors add substantial natural light to the living room.

The steel column has been connected to all the floor structure needing support, so the last temporary support can be removed.

The steel column has been connected to all the floor structure needing support, so the last temporary support can be removed.

The seating area has tall windows and is open to the living room and kitchen.

The seating area has tall windows and is open to the living room and kitchen.

October 8, 2018 12:31 pm

The Union City Addition works seamlessly with the original house

We’re closing in on the final finishes in this small, sensitive addition to a home originally designed by William Bain, located near Montlake Playfield south of Portage Bay.

The shower has been tiled and is ready for trim and glass.

The shower has been tiled and is ready for trim and glass.

The sitting room/ library/ guests bedroom has full height windows to the private rear yard.

The sitting room/ library/ guest bedroom has full-height windows looking out on the private rear yard.

The addition has a brick base and siding to match the existing residence.

The addition has a brick base and siding that matches the existing residence.

September 28, 2018 3:06 pm

Introducing the Cedar Park Kitchen & Great Room Remodel

We’ve recently begun construction on a new remodeling project in the Cedar Park neighborhood of Lake City. The house originally had walls separating the kitchen, dining room, and a sunken living room. We’ll be creating an open plan for the main floor and a more functional kitchen, and opening up the space to the views of Lake Washington. The new great room will comprise the dining, family, and living rooms, with the kitchen adjacent.

Demolition has already been completed and framing is underway.

Old windows removed and ready for the new windows.

Out with the old windows; ready for the new.

The old sunken living room has now been brought up tot he height of the rest of the floor.

The old sunken living room has now been brought up level with the rest of the floor.

The floor joists have been cut back to allow for the new steel beam which will allow for the large open space.

The floor joists have been cut back to allow for the new steel beam, which will allow for the large open space of the great room.

September 7, 2018 11:19 am

Filling the Madison Heights Bungalow Addition with Light

With drywall complete and painting underway, this remodel and addition are ready for trim and cabinets. The whole space is coming together rapidly.

the original cove ceiling has been repaired and all new lighting and speakers installed.

The original cove ceiling has been repaired, and all-new lighting and speakers installed.

The skylight and cathedral ceiling in the bathroom create a dramatic space.

The skylight and cathedral ceiling in the bathroom create a dramatic space.

The pyramidal skylight well in the kitchen will help define the space while reducing the need for artificial light.

The pyramidal skylight well in the kitchen will help define the space while reducing the need for artificial light.

August 22, 2018 9:25 am

The completed Normandy Park Kitchen remodel

This project wrapped up several months ago, but we just now had the opportunity to visit and take a few scouting photographs. The clients are very pleased with the transformation of their kitchen.

You can see images of this as a work in progress here and here.

looking from the entry towards the kitchen.

Looking from the entry towards the kitchen. The island has a heated countertop to take the chill out of cold winter mornings.

Looking from the kitchen towards the dining room and fireplace.

Looking from the kitchen towards the dining room and fireplace.

The island cabinet is stained dark to coordinate with the furniture and the perimeter cabinets are white to keep the bright open look of the original architecture.

The island cabinet is stained dark to coordinate with the furniture, and the perimeter cabinets are white to keep the bright, open look of the original architecture.

August 9, 2018 10:52 am

Madison Heights Bungalow: Pre-Drywall & Post-Drywall

Today we’re catching up on all the recent progress at the Madison Heights Bungalow project on the eastern side of Capitol Hill. After the house systems (electrical, plumbing, and HVAC) were roughed in, we photographed every wall and ceiling. This makes any future modifications or troubleshooting easier down the line: like taking pre-emptive X-rays!

A wall in the kitchen prior to drywall.

A wall in the kitchen prior to drywall.

a portion of the basement ceiling showing the amount of systems that are within a ceiling.

This portion of the basement ceiling reveals just how many systems are contained within.

The back porch ready for siding and handrails.

The back porch is ready for siding and handrails.

Just a few brackets under the cantilevered portion of the addition.

Just a few (!) brackets supporting the cantilevered portion of the sunroom. These provide a nice visual reference to the brackets on the front of the house.

 

 

Once the documentation was complete, we proceeded with installing the drywall. Meanwhile, the carpenters move to the exterior to work on the porches and siding.

The sunroom is already exhibiting great daylighting, as planned.

The sunroom is already exhibiting great daylighting, as planned. The skylights have integral blinds that will keep out the heat when needed.

With the drywall in the upper floor the recycled walnut beams are nicely highlighted.

The upper floor showcases the recycled walnut beams and exposed brick chimney.

The basement is dedicated to climate controlled storage.

The basement is dedicated to climate-controlled storage.