Framing is nearly complete

Systems are being installed, windows start next week, one side at a time with the stucco installers following along behind. We hope to have the scaffolding off in six weeks!

 

Stained glass location in the entry.

 

The kitchen addition, ready for windows and systems.

 

The back hall has a sloped ceiling to match the other end of the hall



COVID-19 Protocols

COVID-19 Protocols