Loyal Heights Progress

The bathroom is being tiled and trimmed. The exterior is ready for Stucco and handrail.

 

Ready for tile, columns, and balustrade.

 

Ready for the Back Porch

Tags:
,


COVID-19 Protocols

COVID-19 Protocols