Scaffolding to be removed once the stucco is complete

The insulation and exterior stucco are being installed. All the plumbing and electrical has been roughed in. It will be ready for interior gypsum wall board soon.

 

Stucco being installed with final color.

 

Master shower and master tub.

 

Original entry roof bracket being reconditioned.

Tags:
,


COVID-19 Protocols

COVID-19 Protocols