May 18, 2017 11:50 am

Emerald Park Addition is ready for finishes!

The drywall has been installed. The remodel is ready for finishes: cabinets, trim, floors and paint.

The back deck.

The back deck. The space under the deck will be dry space–screened from view, and used for storage.

The kitchen skylight well and window seat.

The kitchen skylight well. The window seat will also serve as seating for the kitchen table.

The bay window in the master bedroom looks out to the back yard.

The bay window in the master bedroom looks out to the back yard.

February 24, 2017 4:13 pm

Emerald Park Addition is ready for siding

The window trim has been installed along with the water barrier, siding is next. Inside the rough-in is nearly complete. Insulation should begin in March.

The kitchen sink will have plenty of natural light with these windows.

The kitchen sink will have plenty of natural light with these windows.

The bay will eventually be all trim, making it a focal point on the rear of the house.

The bay will eventually be all trim, making it a focal point on the rear of the house.

February 16, 2017 1:11 pm

Almost ready for siding

The fluid applied vapor permeable water barrier has been applied. Siding and flashing is next. The deck and front porch columns will also be installed soon. Now that the windows are in the insulation can be installed and then its on to gypsum wall board on the interior. All rough plumbing and electrical has been installed.

The addition is ready for siding and the deck.

The addition is ready for siding and the deck.

The skylight well will bring lots of light into the kitchen.

The skylight will bring lots of light into the kitchen.