August 24, 2017 8:59 am

Burke Remodel is complete

The extensive Burke remodel and addition has finally been completed! By raising the house almost two feet, the lower floor no longer feels like a basement. The top floor has cathedral ceilings throughout, offering ample headroom while maintaining the classic Craftsman-style gable-end detailing and proportions. With this remodel, the once cramped and disordered residence has become a comfortable, generous, and smoothly functioning home.

Previous updates on this home’s progress can be found here and here.

Raising the house almost two feet and redesigning the entry porch give this home a new street presence.

Raising the house almost two feet and redesigning the entry porch give this home a new street presence.

The custom kitchen cabinets include a ‘magic corner’ and toe kick step stool from Hefele.

The convenient appliance pantry means more counter space on the island.

The breakfast nook opens directly to the deck, which has views of Lake Union and the Cascade Mountains.

This child’s bedroom has cathedral ceilings and lots of natural light. The dark color of the ceiling evokes a night sky.

The master bathroom has a classic feel with dark cabinets, marble counter and basketweave tile floor.

The clean lines of the large shower bring a modern touch to this classic bathroom.

October 6, 2015 9:53 am

Ready for insulation?

Whenever one of our projects is ‘ready for insulation’  we recommend a full set of photographs be taken of every wall, ceiling and floor. This record should be kept with the house as it will be useful for any future issues or just locating a stud! This project will be ready for insulation next week and the contractor will be making the photographic record.

This is the 'wet wall' of the new bathroom in the basement.

This is the ‘wet wall’ of the new bathroom in the basement.

Here the lower wall is framed out for insulation at the below grade portion of the wall.

Here the lower wall is framed out for insulation at the below grade portion of the wall.

July 29, 2015 3:09 pm

Framing is nearly complete on this remodel

As the walls go up and the roof is on the client has been pleased to see the transformation of their home. With the cathedral ceilings and efficient layout, they have been getting compliments on the design, even before construction is complete.

The master bedroom will have windows wrapping the east end of the room.

The master bedroom will have windows wrapping the east end of the room.

The south facing bedroom.

The south facing bedroom.

The west facing bedroom ready for windows.

The west facing bedroom ready for windows.

May 13, 2015 10:58 am

In position

The house has been set at its new height. The support structure is in place, and the rough plumbing is being installed.

The Steel structure is all in place and holding up the house.

The Steel structure is all in place and holding up the house.

Rough plumbing being installed along with an interior sub slab drainage system.

Rough plumbing being installed along with an interior sub slab drainage system.

https://www.youtube.com/watch?v=EMaiVc_KKMg

The porch is now set at its final height.

May 5, 2015 12:09 pm

House to be lowered onto re-framed, taller basement walls.

The re-framed walls are completed and the interior steel structure is in place. The house will be lowered and secured later this week.

Re-framed walls are clearly visible and ready to receive the house.

Re-framed walls are clearly visible and ready to receive the house.

The Steel is in place to open up the basement space.

The Steel is in place to open up the basement space.

As the house is lowered the cribbing seen here will be removed.

As the house is lowered the cribbing seen here will be removed.

April 1, 2015 12:06 pm

Demolition

Demolition is under way on a substantial remodel and house lift. As usual we found a few unusual conditions, and they are already under control.

The attic is being prepared for a new dormer

The attic is being prepared for a new dormer.

 

The basement will be enlarged and the columns replaced with a steel beam.