Ellen MirroAug 11, 20161 min readFoundation poured, next the concrete roofThe exterior walls of this below grade addition have been completed. The concrete roof gets poured next. Preparing to frame the forms for the roof. The opening to the basement of the existing house.
The exterior walls of this below grade addition have been completed. The concrete roof gets poured next. Preparing to frame the forms for the roof. The opening to the basement of the existing house.
Commentaires