The phase 2 kitchen and deck are now well under way as phase one move into the final finishing.
The main deck framing is up. Joists should be installed soon.
The windows have been installed in the master bedroom. Trim is next.
The tile has been installed in the master bathroom; a 2″ marble hex tile.
The son’s room has a dark blue ceiling and great light from the south facing windows.
Comments