The scaffolding is up, concrete is poured and steel erection beginning at our deck replacement project in Maple Creek. This project will seismically retrofit the previously vulnerable southern wing of the home and replace a previously dangerous deck. The project location is within three environmentally critical areas, which made permitting a challenge. Now that the permit has been issued, the contractor, Houseworks Construction, has the challenge of working on a constricted site with limited access. Because the house is on a steep slope, the new foundation uses pin piles to support the cantilevered southern end of the house on a steel moment frame. We are looking forward to the installation of the steel for the cantilevered deck!
Deck design for construction 2017
Existing deck, 2016
Comments