top of page

Emerald Park Addition is ready for siding

  • Writer: Ellen Mirro
    Ellen Mirro
  • Feb 24, 2017
  • 1 min read

The window trim has been installed along with the water barrier, siding is next. Inside the rough-in is nearly complete. Insulation should begin in March.

The kitchen sink will have plenty of natural light with these windows.


The bay will eventually be all trim, making it a focal point on the rear of the house.


Комментарии


bottom of page