top of page
Ellen Mirro

Madison Heights bungalow addition is ready for insulation

Today we’re checking in at the addition and remodel project in the Madison Heights area of Capitol Hill. The existing bungalow from 1925 is getting a new sunroom, cathedral ceilings, a full basement, detached garage, and renovations that make the main floor fully accessible.

The last time we saw this project, the framing and new roof had just been completed. The next step now is installing insulation and then the wallboard. As that work proceeds, the exterior hardscape will be installed.

Plumbing and electrical rough-in are nearing completion.


The front porch will include stairs, space for a bench, and a wheelchair lift for accessibility.


The shower and tub room ceiling is sloped to minimize drips from steam condensation.


1 view0 comments

Recent Posts

See All

Comments


bottom of page