top of page
Ellen Mirro

Progress in Wallingford

The siding is transforming the appearance of this house lift and second-floor addition. The interior cabinets and finishes are also being installed–and are looking terrific.

The siding installation is proceeding. These are Hardie siding from the architectural line, so have nice deep shadows.


The lower-floor bathroom floor flows into the zero-threshold shower. The tile walls are flush with the wallboard.


3 views0 comments

Recent Posts

See All

Comments


bottom of page