top of page
HAPPENINGS AT TJP
Search
Ellen Mirro
Oct 12, 20161 min read
Passive/Active Solar Home Nears Completion on Whidbey Island
ith the weather report warning of incoming rainstorms, we took advantage of the beautiful fall day to visit one of our designs under...
1 view0 comments
Ellen Mirro
Sep 27, 20161 min read
A small addition can make a big difference.
This small addition in the green lake neighborhood has just begun and will not be visible from the street. It is not about street appeal....
1 view0 comments
Ellen Mirro
Sep 21, 20161 min read
Progress on Freeland Residence
This new home is progressing. With the exterior work finishing up, the interior finishes are in full swing. The large overhangs protect...
1 view0 comments
Ellen Mirro
Sep 1, 20161 min read
Just the floor slab pours to go…
…and then the concrete work will be completed and interior framing can begin! The lid for the below-grade room. Waterproofing and...
1 view0 comments
Ellen Mirro
Jul 25, 20161 min read
Progress on Whidbey
One of our clients is busy building this summer and looking forward to moving in this fall. The extended overhang facing southwest limits...
1 view0 comments
Ellen Mirro
Jun 29, 20161 min read
Just a few last bits to be finished
But the owners are moving in now! Look for this project to show up in our portfolio next spring (after the client is settled and the...
1 view0 comments
Ellen Mirro
Mar 15, 20161 min read
Finishes
As the painters move in for the next few weeks, all the other interior finishes are almost completed. The skylight, flush with the wall...
1 view0 comments
Ellen Mirro
Feb 3, 20161 min read
Progress in Wallingford
The siding is transforming the appearance of this house lift and second-floor addition. The interior cabinets and finishes are also being...
3 views0 comments
Ellen Mirro
Oct 28, 20151 min read
The Closed Cell Foam Insulation Has Been Installed
From now until completion changes get more involved. But it also means the finishes will start being installed in November! Once the batt...
1 view0 comments
Ellen Mirro
Oct 6, 20151 min read
Ready for insulation?
Whenever one of our projects is ‘ready for insulation’ we recommend a full set of photographs be taken of every wall, ceiling and floor....
1 view0 comments
Ellen Mirro
Sep 17, 20151 min read
A new Deck and Bay Window are taking shape
At the top of a steep slope with views of lake Washington, this deck and bay will take full advantage. Below the deck will be a series of...
1 view0 comments
Ellen Mirro
Aug 26, 20151 min read
Entry walk nears completion
The custom guard rail is a great stylistic match to the original with advantage of steel for strength and durability. The entry walk is...
1 view0 comments
Ellen Mirro
Jun 23, 20151 min read
Villa Luna Guest Bath
The contractors (brother and sister Dan and Katherine Buker) have finished the Guest Bathroom at Villa Luna. The bathroom features a...
3 views0 comments
Ellen Mirro
Jun 8, 20151 min read
Villa Luna Kitchen
The kitchen at Villa Luna is nearing completion. The cabinets in the corner provides a convenient place near the door to stash leashes...
1 view0 comments
Ellen Mirro
May 13, 20151 min read
In position
The house has been set at its new height. The support structure is in place, and the rough plumbing is being installed. The Steel...
2 views0 comments
Ellen Mirro
May 5, 20151 min read
House to be lowered onto re-framed, taller basement walls.
The re-framed walls are completed and the interior steel structure is in place. The house will be lowered and secured later this week....
1 view0 comments
Ellen Mirro
Apr 1, 20151 min read
Demolition
Demolition is under way on a substantial remodel and house lift. As usual we found a few unusual conditions, and they are already under...
2 views0 comments
Ellen Mirro
Jan 16, 20151 min read
Stilli Gets Solar
Although we have encouraged sustainability in our projects, photovoltaics have been design engineered out of many of our projects due to...
2 views0 comments
Ellen Mirro
Oct 13, 20141 min read
Stillidale Exterior Nearly Complete
Larry and Lani started remodeling their cabin on the North Fork of the Stillaguamish River early this July. The exterior is now nearly...
1 view0 comments
Ellen Mirro
Sep 25, 20141 min read
Yes we do have projects on the East side.
This small addition is now under construction. It will open up the kitchen, add a breakfast nook and expand the master bath on the upper...
1 view0 comments
bottom of page